In Scotland, a building warrant is the council's permission to carry out building work, based on drawings that show the work will meet the Scottish building regulations. If your job needs one, you must have it before work starts. Starting without one is an offence.
This guide covers the basics for homeowners. Every council's building standards team will tell you whether your particular job needs a warrant, and it's always worth asking them.
The short answer
You'll usually need a building warrant if your plans include:
- extending your home, such as a kitchen extension or a sunroom;
- altering the structure, such as removing or changing a load-bearing wall, or making a new opening in an outside wall;
- converting space into a room, such as a loft or garage conversion;
- demolishing all or part of a building;
- building a new home.
Much everyday work doesn't need a warrant. Many like-for-like replacements, such as a new kitchen or bathroom in the same place, usually don't. But work that doesn't need a warrant still has to meet the building regulations, and moving drainage, adding a new soil pipe or changing the structure can change the answer. If in doubt, ask your council before you start.
A warrant is not the same as planning permission
They're two different checks, and you might need both, either or neither:
| Planning permission | Building warrant | |
|---|---|---|
| What it's about | Whether the work is acceptable where it is: how it looks, its effect on neighbours, the area | How the work is built: structure, fire safety, drainage, energy, access |
| Who deals with it | The council's planning team | The council's building standards team |
| Typical examples | Extensions, dormers, changes to listed buildings or in conservation areas | Extensions, structural alterations, conversions |
If your home is a listed building or in a conservation area, there may be extra permissions too. Many older tenements and town-centre buildings in Glasgow, Edinburgh and Stirling fall into one or the other.
How to apply
- Get drawings and a specification. Most people use an architect, an architectural technician or their builder's designer. The drawings show what will be built and how it meets the regulations.
- Apply to your council. Applications go to the council's building standards team, usually online through the Scottish Government's eBuilding Standards portal. There's a fee, based on the value of the work.
- Answer any questions. The council may ask for changes or more detail before granting the warrant.
- Start work once the warrant is granted, and build what was approved. If the plans change, an amendment may be needed.
Who applies is up to you: often the architect or builder does it as your agent. Agree who's responsible before you accept a quote, and write it down. The warrant is in the owner's name, and the responsibility stays with the owner.
OnBelt lays quotes side by side, in stages, with VAT shown, and keeps the whole job in one place. It’s coming soon.
Get early accessDuring the work
The council will usually want to inspect at certain points, set out in a construction compliance and notification plan that comes with the warrant. Your builder will need to let the council know when those stages are reached. Inspections check the work against the regulations. They're not a check on the quality of finish.
It makes sense to line your stage payments up with these inspections, so you're paying for work the council has seen.
When the work is finished
When everything's done, a completion certificate is submitted to the council, saying the work has been done as the warrant allowed. The council checks and, if it's satisfied, accepts the completion certificate. Keep it safe.
A warrant is usually valid for three years from the date it's granted. If the work isn't finished in time, you can ask the council to extend it.
What if work was done without a warrant?
If work that needed a warrant was done without one, the council can take enforcement action, which can include a fine or an order to put things right. You can apply for a completion certificate for work done without a warrant, and the council will decide whether it meets the regulations.
This matters most when you sell: the buyer's solicitor will usually ask for warrants and completion certificates for alterations, and missing paperwork can hold up a sale. If you're buying, ask about any alterations early.
Your council in the Central Belt
Building warrants are handled by the local council where the property is:
- Glasgow: Glasgow City Council (OnBelt in Glasgow)
- Edinburgh: City of Edinburgh Council (OnBelt in Edinburgh)
- Paisley: Renfrewshire Council (OnBelt in Paisley)
- Motherwell: North Lanarkshire Council (OnBelt in Motherwell)
- Livingston: West Lothian Council (OnBelt in Livingston)
- Falkirk: Falkirk Council (OnBelt in Falkirk)
- Stirling: Stirling Council (OnBelt in Stirling)
- Dunfermline: Fife Council (OnBelt in Dunfermline)
Check the official guidance. This guide is general information, not legal advice. For your own job, speak to your council's building standards team. The Scottish Government's guidance is on mygov.scot and the law is the Building (Scotland) Act 2003.
Frequently asked questions
Do I need a building warrant to replace a kitchen or bathroom?
Usually not, if you're replacing like for like in the same place. Moving drainage, adding a new soil pipe, or altering walls can change that, so ask the council if you're doing more than a straight swap.
Do I need a building warrant for a loft conversion?
Yes. Converting a loft into a room is a conversion, and it involves structure, stairs, fire safety and insulation, so it needs a warrant.
How long does a building warrant last?
Usually three years from the date it's granted. If the work won't be finished in that time, you can ask the council for an extension.
Can my builder apply for the warrant?
Yes, a builder, architect or technician can apply on your behalf. The warrant is still for your property and you remain responsible for it, so agree in writing who is handling it.
Is a building warrant the same as planning permission?
No. Planning permission is about whether the work is acceptable where it is. A building warrant is about how it's built. Some jobs need both.